Timber Creek Playground

The Winfield Park District is accepting bids for Timber Creek Playground.

Status

Bidding Closed

Bid Date8/15/18 2:00 pm

Company & Contacts

Upland Design Ltd.

Maria Blood (mblood@uplanddesign.com)   815-254-0091

Location

Timber Creek Dr, Winfield, IL 60190

Work generally includes installation of playground equipment, poured rubber surfacing, and
lawn restoration.

Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the
successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor
and Material Payment Bond, and required proof of insurance following the award of a
contract.

All contracts for work herein are subject to all Park District rules and regulations, and
providing for the payment DuPage County’s prevailing wage rate to all workers involved in
this project.

All bids will remain firm for 90-days after the bid opening. The Winfield Park District
reserves the right to reject any or all bids, to waive informalities on a bid, and to accept
the lowest responsible bid that serves the best interests of the Park District.