Public Jobs
Bids due in 7 days
6/5/23 2:00pm
Walker Park 2-5 Playground Renovations & Landscape Improvements
Bids due in 7 days
Planning Resources
Burr Ridge, Illinois 60527
This work is related to the Walker Park 2-5 Playground Renovation and Landscape Improvements and includes installation of owner furnished Landscape Structures Inc. (LSI) playground equipment, poured-in-place resilient rubber play surface, installation of recycled/repurposed modular block retaining wall components, drainage improvements, landscaping, seeding, mulch beds, and installation of erosion control blanket and any other miscellaneous work necessary for a complete job as depicted in the plans and specifications.
Bidding Closed
5/11/23 1:00pm
Apple Orchard Community Park Renovations
Bidding Closed
Upland Design Ltd.
Bartlett, Illinois 60103
Work generally includes removals, installation of playground equipment and site furniture, concrete paving, skate park renovation, asphalt paving, engineered wood fiber, crushed stone surfacing, signage and restoration.
Bidding Closed
5/18/23 1:00pm
Geneva Public Library Fence and Story Walk
Bidding Closed
Upland Design Ltd.
Geneva, Illinois 60134
Work generally includes removals, bollard lighting, parking lighting, sign installation, metal fencing, landscaping, and restoration.
Bidding Closed
5/10/23 10:00am
Sportsplex Switchgear
Bidding Closed
St Charles Park District
St. Charles, IL 60174
This project generally consists of but not limited to: All materials, labor, and programming necessary to install new switchgear at Sportsplex, an indoor turf facility owned and operated by the St. Charles Park District.
Bidding Closed
4/27/23 11:00am
Glenbriar Park - Building Demolition
Bidding Closed
Upland Design Ltd.
Lombard, Illinois 60148
The scope of work for this project includes demolition of existing structures and restoration at Glenbriar Park
Bidding Closed
4/14/23 10:00am
Troy Hofer Elementary Playground Renovation
Bidding Closed
Upland Design Ltd.
Plainfield, Illinois 60586
Work generally includes removals, playground equipment installation, and poured-in-place rubber surfacing installation, fence installation, concrete paving, site furniture, landscape plantings, drainage and restoration work.
Bidding Closed
4/28/23 3:00pm
Lakefront Park Expansion and Reconstruction
Bidding Closed
Site Design Group
Fox Lake, IL 60020
Park improvements include removals and grading, roadways and parking lots, storm sewer utilities, site lighting, walking paths, site furnishings, playgrounds, installation of site structures, a restroom building, a swimming beach, and landscape work.
Bidding Closed
4/11/23 10:00am
Village Green Park Parking Lot Improvements
Bidding Closed
Glen Ellyn Park District
Glen Ellyn, IL 60137
The Work generally includes (but is not limited to): Mill and overlay of an existing parking lot and basketball court. Includes acrylic surfacing of a basketball court.
Bidding Closed
3/30/23 1:30pm
Newcastle Park Playground Renovation
Bidding Closed
Upland Design Ltd.
Roselle, IL 60172
Work generally includes concrete paving, removal and installation of play equipment and turf restoration.
Bidding Closed
3/30/23 1:00pm
Turner Park OSLAD Development
Bidding Closed
Upland Design Ltd.
Roselle, IL 60172
Work generally includes earthwork, concrete paving, asphalt paving, removal and installation of play equipment, fitness equipment, site furniture, removal and installation of picnic shelter, electric at picnic shelter, landscape material and lawn restoration.