Washington Park Playground Renovation

Work generally includes removal of playground surfacing and concrete paving. Installation of engineered wood fiber surfacing, playground equipment, site furniture, concrete paving, landscape material and lawn restoration.

Status

Bidding Closed

Bid Date3/1/22 1:00pm

Company & Contacts

Upland Design Ltd.
Dan Wilson (dwilson@uplanddesign.com)  
815-254-0091

Location

401 N. Washington St. Batavia, IL 60510

Sealed proposals for Washington Park Playground Renovation in Batavia, IL, shall be
received at the Park District offices: 327 West Wilson Street Batavia, Illinois 60510 until
1:00 p.m. local time, March 1, 2022, at which time all bids will be publicly opened and read
aloud.
Work generally includes removal of playground surfacing and concrete paving. Installation
of engineered wood fiber surfacing, playground equipment, site furniture, concrete paving,
landscape material and lawn restoration.
Bid documents will be available from Accurate Repro, Inc.’s Planroom beginning February
15, 2022 at 11:00am. Plans are available for printing or download. Phone: (630) 428-
4433. www.accurateplanroom.com.
Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the
successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor
and Material Payment Bond, and required proof of insurance following the award of a
contract.
All contracts for work herein are subject to all Park District rules and regulations, and
providing for the payment of Kane County’s prevailing wage rate to all workers involved in
these projects. All bids will remain firm for 60 days after the bid opening. The Batavia Park
District reserves the right to reject any or all bids, to waive informalities on a bid, and to
accept the lowest responsible bid that serves the best interests of the Park District.