Anne Fox Park Playground

Work generally includes asphalt paving, concrete paving, concrete sloped entry, sloped entry with curb, integral curb at walk, curb at playground, engineered wood fiber, installation of playground equipment, purchased separately by the Hanover Park Park District, furnishing and installing a picnic shelter, bench, picnic table, game table, playground underdrainage, drain cleanout, mitered drain, shade trees, ornamental trees, shrubs, perennials, ornamental grasses, and lawn restoration.
Addendum No. 1 (click to expand/collapse)
Order files below for $0.00 each
Name Size
2024_04_30 1240 Anne Fox_ Addendum #1 832.8 KB