Rotary Park Development / Firefighter's and Schoppe Park Playground Renovations
Status
Bidding Closed
Bid Date3/6/24 1:00pm
Location
Bartlett, Illinois 60103
Sealed proposals for Rotary Park Development as well as Firefighter’s and Schoppe Park
Playground Renovations in Bartlett, IL, shall be received at the Bartlett Park District office:
696 W. Stearns Road, Bartlett, IL 60103 until 1:00 p.m. local time, March 6, 2024, at which
time all bids will be publicly opened and read aloud.
Work generally includes concrete paving and curb, engineered wood fiber surfacing,
playground equipment installation, site furniture installation, playground underdrainage,
shade trees, and lawn restoration.
Bid documents will be available from Accurate Repro, Inc.’s Planroom beginning February
19, 2024 at 11:00am. Plans are available for printing or download. Phone: (630) 428-4433.
Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the
successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor
and Material Payment Bond, and required proof of insurance following the award of a
contract.
All contracts for work herein are subject to all Park District rules and regulations, and
providing for the payment of DuPage and Cook County’s prevailing wage rate to all workers
involved in these projects. All bids will remain firm for 60 days after the bid opening. The
Bartlett Park District reserves the right to reject any or all bids, to waive informalities on a
bid, and to accept the lowest responsible bid that serves the best interests of the Park
District.